My Crossword Maker Logo
Powered by BrightSprout
Save Status:
or to save your progress. The page will not refresh.
Controls:
SPACEBAR SWITCHES TYPING DIRECTION
Answer Key:
Edit a Copy:
Make Your Own:
Crossword Word Search Worksheet
Rate This Puzzle:
Log in or sign up to rate this puzzle.

Lockout/Live Conveyor

Across
_____ conveyor according to lockout procedures.
_____ remove guards necessary to track a conveyor.
_____ from all energy sources.
_____ a team member at the disconnect.
Turn _____ the equipment.
Remain in direct visual or radio contact with the _____ person in charge to de-energize the equipment if necessary.
_____ that the equipment is locked out using 1 of 4 methods.
_____ for all assistants.
_____ belt tracking away from live parts.
Down
_____ power by putting the disconnect in the "ON" position.
_____ conveyor and inspect for FOD, missing tools, etc.
_____ the area for FOD, tools, etc.
_____ or close any open or missing guards.
_____ everyone in the affected area that the equipment will be locked out.
_____ your lock when everyone has been notified.
The authorized person in charge must place him/herself at a safe distance (no closer than ___ feet) from the nearest point where the belt runs into the component with all assistants safely behind them.
_____ conveyor before replacing conveyor guards.
Notify everyone in the _____ area that the equipment will be brought back to operation.
Apply your _____.