My Crossword Maker Logo
Powered by BrightSprout
Save Status:
or to save your progress. The page will not refresh.
Controls:
SPACEBAR SWITCHES TYPING DIRECTION
Answer Key:
Edit a Copy:
Make Your Own:
Crossword Word Search Worksheet
Rate This Puzzle:
Log in or sign up to rate this puzzle.

cosc crossword 3

Find the words that correspond with the given hints
Across
It is the construction of a temporary structure into which concrete is poured for it to be settled and set in the desired form
Assists the Project Manager and Superintendent with the details of the contract
Maintain costs of a project within or below estimates
Inserted between two distinct materials in a structure which do not have any physical connection to one another but are either aligned next to each other or overlap
Managing the general and supplemental conditions of the contract
Abbreviation of the safety agency that enforces standards through rigorous inspections at the jobsite.
Amount of time an activity can be delayed before it impacts the project’s completion
the condition of being protected from or unlikely to cause danger, risk, or injury
A term used to describe defective construction work that must be redone or corrected
Down
A % held from GC to encourage completion of the project
Request For Information abbreviation?
issued by a surety company and act like a form of credit, use their financial resources to back the obligations of the contractor
The importance of tracking every aspect of project performance
These drawings are usually prepared by a civil engineer, and describes all work associated with the site.
Describe overall aesthetics of the facility, including project size, shape and appearance.
Are used to protect ones eyes from foreign objects
What does the abbreviation AOA stand for?
These risks can shut down your project
Risk that can shut down your project, for example: endangered species, hazardous materials
Used when there are no drawing at all or when you are in the idea or concept stage of a project
Practice of initiating, planning, executing, and controlling the work of a team to achieve specific goals
The building of large structures considered as an industry
The worker who is in charge of procuring the project