My Crossword Maker Logo
Powered by BrightSprout
Save Status:
or to save your progress. The page will not refresh.
Controls:
SPACEBAR SWITCHES TYPING DIRECTION
Answer Key:
Edit a Copy:
Make Your Own:
Crossword Word Search Worksheet
Rate This Puzzle:
Log in or sign up to rate this puzzle.

Crane-Hoisting-Rigging - Life Critical (EMS 2.01.01.1)

Teacher: LB
Across
Rigging activities are to be included in the facilities ___________ program to ensure compliance with this Standard?
Cranes, hoists and lifting devices are provided with a durable and clearly legible indication of the ___________ that is readily accessible to the operator at the control station?
________ is provided and kept readily available for each crane with a rated load greater than 5 tons?
Workers must have current _________ to perform any hoisting and rigging?
Facilities are to ensure when __________ are required the lift operator has a clear line of site to the signaler, without entering into the barricaded area?
This form is used to assist with the identification and mitigation of workplace related hazards?
Down
______ are to be verified and be within the capabilities of the crane, rigging and hoisting equipment prior to beginning a lift?
An itemized inventory of all __________ on-site is to be retained?
Under no circumstances will personnel be under a __________ load?
Any sequence of operations in which a hoisting device raises an object above the ground, floor, or support, and then places it on the ground, floor, or support?