Fuel Sipping RP coverage

Across
Document which specifies tool requirements.
Treat all high radiation readings as this until instruments are proven defective.
Minimum level of alpha control as noted on ALARA Plan 2019 74.
Tools used in the Spent Fuel Pool must be constructed to prevent this radiation hazard.
This type of object can have dose rates greater than 10 rem/hr.
An SRD dose alarm requires an RP to take this action.
Take this action with the item if an ARM unexpectedly alarms while raising an item from the fuel pool.
Down
In addition to the RPM and SVP, this person can override a Stop Work Order.
Word used to describe poles/tools used for handling objects in reactor cavity.
The capability for this air sample must be available during evolutions with potential for significant fuel damage.
In addition to the RPM, Work week or Outage manager; this individual requires notification of Stop Work Authority.
This action taken to reduce contamination can also cause the spread of particles if not done properly.
First step if ARM alarms due to an unknown condition.
Type of coverage needed for work involving HRO's.
Frequency to verify area radiation monitor operability.