session 1 CDBG-I

Teacher: Winston Cole
Across
A fundamental difference between Clean Water State Revolving Fund (CWSRF) and Community Development Block Grant-Infrastructure Program (CDBG-I) is that CWSRF offers low interest loan programs and CDBG-I is a _____.
Applicants can submit _____ applications in the same round. However, only one award can be made per applicant. Exception is given to water and sewer rehab projects on the same footprint.
Applicants are selected for awards based on points system from four main categories of priority criteria which are; system management, severity of need, economic need and ______ relief.
Project _____ must have at least 51 percent low to moderate income population.
It is anticipated that there will be $13 million available to ____ water and wastewater programs in the 2015 CDBG-I)
______ cost which can include environmental review, engineering report, application preparation and administration of grant requirements are capped at 10 percent of project cost.
Down
Generally there are two dates set aside in the year to receive _________ for CDBG-I projects, this year applications are due on March 31st and September 30th.
______ need can be established by showing percent of low to moderate income persons served by either survey or use American Community Survey data.
An applicant can apply for not more than $3.0 million over _____ year period.
Project budget should be included and must be sealed by a professional engineer however; engineer’s report is not required upfront with CDBG-I application.
One should not be _____ to apply for the grant. In addition to economic needs, projects that mitigate problems causing regulatory actions and projects addressing environmental and public health threats are considered important by the program administrators.
Resubmitted projects (projects submitted again after being denied funding earlier) scores can either go up or stay same but will not go ____ . When resubmitting mark application as a RESUBMITTAL so they can pull your previous scorecard.