Across
A project _______ is defined as an outcome of actions, behaviors, products, services, or results that provide value to the organization and beneficiaries
PM processes are logically linked by the ______ they produce
In a _______ life cycle, the project scope, time, and cost are determined in the early phases of the life cycle. Any changes to the scope are carefully managed. Also referred to waterfall life cycle and a type of development life cycle and a phase of the project life cycle
The project ________ is generally accountable for the development and maintenance of the project business case document
The application of knowledge, skills, tools, and techniques to project activities to meet the project requirements
The phases of a life cycle can be described by a variety of _______, which may be measurable or unique to a specific phase. Ex - name, number, duration, resource requirements, and/or entrance/exit criteria
A ________(GO/NO-GO) is made based on the business documents derived from a phase gate and may result in the following: 1. Continue to the next phase 2. Continue to the next phase with modification 3. End the project 4. Remain in the phase 5. Repeat the phase or elements of it
Program and project management focus on doing the programs and projects the ____ ____
A _______ life cycle is a combination of a predictive and an adaptive life cycle. Those elements of the project that are well known or have fixed requirements follow a predictive life cycle, and those elements that are still evolving follow an adaptive development life cycle. Also a phase in the project life cycle.
The phases of a project may be sequential, _____, or overlapping
A systematic series of activities directed toward causing an end result where one or more inputs will be acted upon to create one or more outputs
Project life cycles can be predictive or _______
Within a project life cycle, where one or more phases are associated with the development of the product, service, or result
Life cycle _______ may be accomplished by: 1. Identifying the processes needed to be performed 2. Performing the processes in the appropriate phase 3. Adjusting the various attributes of a phase
The _____ ______ ______ is managed by executing a series of project management activities known as PM processes
Down
The project manager needs to ensure that the project mgmt approach captures the ______ of the business documents
Projects may be separated into distinct phases or _______ that indicate the type of work done in that phase such as: concept development, feasibility study, design, prototype, test, commissioning, etc
A scope concerned with the ongoing production of goods and/or services, efficiently using optimal resources, and managing process that transform inputs
In an ________ life cycle, the deliverable is produced through a series of iterations that successfully add functionality within a predetermined time frame. The deliverable contains the necessary and sufficient capability to be considered complete after the final iteration. Considered a development life cycle and phase of the project life cycle
A ______ assessment often precedes the business case