Outages

1
2
3
4
5
6
7
8
9
10
Across
5
Secondary Oxygen Scavenging
7
Short Notice Outage Work
8
TSP
10
RT
Down
1
Begin using the deborating ion exchanger when RCS boron reaches this concentration.
2
When RCS Boron reaches 50 ppm consider lithium monitoring at this frequency.
3
At what point prior to shutdown would you collect RCS samples for boron-10 analysis.
4
How long prior to the outage would you ensure that temporary ventilation is scheduled to be connected in the Hot Lab
6
Preventative Maintenance Work Order
9
Insoluble activated corrosion products