My Crossword Maker Logo
Powered by BrightSprout
Save Status:
or to save your progress. The page will not refresh.
Controls:
SPACEBAR SWITCHES TYPING DIRECTION
Answer Key:
Edit a Copy:
Make Your Own:
Crossword Word Search Worksheet
Rate This Puzzle:
Log in or sign up to rate this puzzle.

Outages

Across
Secondary Oxygen Scavenging
Short Notice Outage Work
TSP
RT
Down
Begin using the deborating ion exchanger when RCS boron reaches this concentration.
When RCS Boron reaches 50 ppm consider lithium monitoring at this frequency.
At what point prior to shutdown would you collect RCS samples for boron-10 analysis.
How long prior to the outage would you ensure that temporary ventilation is scheduled to be connected in the Hot Lab
Preventative Maintenance Work Order
Insoluble activated corrosion products