My Crossword Maker Logo
Powered by BrightSprout
Save Status:
or to save your progress. The page will not refresh.
Controls:
SPACEBAR SWITCHES TYPING DIRECTION
Answer Key:
Edit a Copy:
Make Your Own:
Crossword Word Search Worksheet
Rate This Puzzle:
Log in or sign up to rate this puzzle.

Agile Crossword

Across
The chart that shows the progress of work being completed starting at zero and working towards a line representing all the work
The cycle that includes planning, analysis, design, coding, unit testing, and acceptance testing (demonstrating software)
A list of feature or technical tasks representing the scope of work to be completed
The further decomposition of requirements from the Feature level, which can be estimated in relative size and complexity and completed within a Sprint
Down
A metric that is determined by how many story points have been completed within a Sprint
The decomposition from the Story level, which is used to generate estimates and determine the velocity of a team
A timebox of work for which the duration is defined by the team and that is related to the team's optimal work cadence
The chart that shows all the work upfront and the trend is towards completing all the effort at point zero