Site Safety Manager

Teacher: Stan
Across
Material must be stored at least ___feet back from perimeters.
On concrete, this is the deck that is being formed.
Where must construction documents be kept?
Required at 60 inches, 42 inches, 21 inches and at zero.
An excavation of any depth that is within 200 feet of a subway requires approval from ______.
Design drawings are required when the concrete slab or beam thickness is equal to or exceeds ______ inches.
_______ must be removed from floors, daily.
A sidewalk shed is not needed for sidewalks that are not ______ to the public.
Just one of the requirements for overhanging material related to concrete operations.
Where work has been interrupted or abandoned and discontinued for a period of at least three months, all open excavations shall be filled and ________ to eliminate all steep slopes, holes, obstructions or similar sources of hazard.
Design and a permit is not required for a chute that is _____ feet or less and has been installed as per the manufacturer's design.
Needed for all excavations, including related or resulting embankments, that are 5 feet or greater in depth.
Down
Material may be as close as ___feet on upper working floors.
Shall be on duty during all hours when operations are not in progress for building footprint 5000 to 40,000 square feet.
Following an accident, equipment, material, evidence may not be used or _________.
In Section 3314 of Chapter 33, you'll find the rules for ________.
A sidewalk ____is required for new construction 40 feet or more in height.
Where work has been interrupted or abandoned and discontinued for a period of at least three months, a safety __________ plan shall be prepared and submitted to the department.
______what !!!!!!
When you excavate more than 100 feet and are within 500 feet of a water tunnel, you need _____ approval.
Hose lines must hang at least ______ feet above the sidewalk.
Vertical netting is not required on the story at ______.